and this is the position it will be in when the museum opens in july. and the shrink wrap is going to come off in march of this year. and you'll be able to see inside the cargo bay and the different places on the shuttle. we have a couple of artists' renderings of what it's going to look like when this massive museum and facility is done. it's 90,000 square feet here, $100 million project to build all of this. and we have tim macy joining us. and tim is in charge of project development. and tim, i know that you left the one sidewall off when you brought the shuttle from the ten miles away and brought it over here, towed it in. now, it still had to be a tight squeeze. >> it was. you know, the width of the wall back there is only about 85 feet, and the wingspan, as you know, is about 82 1/2 feet. when she came around the corner that night, it was a pretty tight fit. it was almost called the ots that had wheels that allow it had to make a turn at 30 degrees. we backed it out, put it right on the spot, easy peasey, no problem. >> reporter: never a concern t